国产精品免费久久久九九,久久草莓香蕉频线观,亚洲精品毛片一区二区,免费久久精品视频,国产人妖ts在线一区二区三区 ,国产区精品一区二区不卡中文,91精品一区二区三区在线观看 ,欧美人在线一区二区三区

8613564568558

Super Lowest Price Pile Driving Analyzer Supplier - JB160A Hydraulic Walking Piling Rig – Engineering Machinery

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our mission is usually to turn into an innovative provider of high-tech digital and communication devices by providing worth added design and style, world-class producing, and repair capabilities for Vibratory Hammer For Pile Driving Manufacturer , Semw D8 Cylinder Type Diesel Pile Hammer , Pile Hammers Manufacturer , While using the improvement of society and economy, our corporation will retain a tenet of "Focus on trust, high quality the first", moreover, we count on to make a glorious long run with each and every customer.
Super Lowest Price Pile Driving Analyzer Supplier - JB160A Hydraulic Walking Piling Rig – Engineering Machinery Detail:

Product Features
HYDRAULIC WALKING PILING RIG
1. MORE EFFECTIVE, STABLE AND DURABLE
The leader, main platform and walking gear are designed for heavy-duty pile driving,?to ensure more stable and effective work.
Weight carrier of bigger load bearing.

2. EASY FOR ASSEMBLY AND TRANSPORATION
Modular structure design, easy for assembly and disassembly.
Out triggers of the platform with the rotary pin structure, is driven by cylinder, which?saves trouble of disassembly. Can be disassembled and transported by parts, easy for
transportation.

3. ADVANCED ELECTRO-HYDRAULIC CONTROL SYSTEM AND TECHNOLOGY
Both main drum and auxiliary drum are under electro-hydraulic proportional control,?available for variable speed control and lock any speed.
Main pump, control valve, pressure gauge, drums are all using domestic and foreign?well-known brands.

4. PRACTICAL AND RELIABLE OPERATION MONITORING SYSTEM
Standard leader with goniometer and inductive load angle monitor (optional) provide instant information about batter piling and pulling force, set alarm while in danger. The previous functions can be achieved while the piling rig working with ZLD series agitating auger and sensors (optional).
Deep mixing pile monitor (optional) provides data of pile depth, piling speed, the amount of slurry, and output of the information.

5. COMFORTABLE OPERATION CAB FOR EASY CONTROL
Well insulated operator’s room with five wind shields assures bright, quiet environment with minimum fatigue.
Hydraulic actuated winch control levers allow well performance and easy control.
Space for drill control box, inductive load angle monitor (optional), deep mixing monitor (optional) is reserved in the operator’s room, make the single-driver control easy and reliable.

TECHNICAL PERFORMANCE CHARACTERISTICS OF JB160A
1. JB160A is equipped with capacious drums. Standard leader is 39m high?(Max.42m), suitable for SMW method.

2. Length of horizontal cylinder reaches up to 3100mm, easy to move while using?SMW method. Horizontal stroke of the cylinder reaches up to 400mm, providing?more flexibility in construction work.

3. JB160A lifting cylinders ensure a 900mm-lift-height.

4. Unique positioning structure design guarantees a self-erect without help of?service crane. JB160A can make 39m height.

5. JB160A was granted complete intellectual property rights and 7 authorized?patents, including 2 patents for invention.

Product Model: JB160A
Specifications

Item JB160A Hydraulic Walking?Piling Rig
Total length of leader (m) 21~39
Diameter of leader (mm) ?920
Center distance between leader and mounted equipment (mm) 600×?101.6
Leader inclination angle (left to right) (°) ±1.5
Backstay stroke (mm) 2800
Leader trimming cylinder stroke (mm) 400
Max. auger model ZLD180/85-3-M2-S
Max. diesel hammer model D160
Max. leader length (m) 39
Max. pulling force (with Max. leader) (KN) 706.3
Hydraulic winch (for mounting auger, diesel hammer) Pulling force of single rope (KN) 91.5max
Winding and rewinding peed (m/min) 0~26
Rope diameter (mm) ?21.5
Drum capacity (m) 550
Hydraulic winch (for uplift, drilling pipe, pile) Pulling force of single rope (KN) 68max
Winding and rewinding peed (m/min) 0~32
Rope diameter (mm) ?20
Drum capacity (m) 265
Swing angle (°) ±10
Transverse travel Travel speed (m/min) < 4.5
Travel step (mm) 3100
Vertical travel Travel speed (m/min) < 2.7
Travel step (mm) 800
Uplift of the track Speed (m/min) < 0.55
Height (mm) +450~-450
Distance between tracks Working (mm) 9100
Travelling (mm) 4800
Distance between pulleys in track Working (mm) 4800
Travelling (mm) 5000
Transverse-moving track Length (mm) 9500
Width (mm) 1200
Vertical-moving track Length (mm) 6900
Width (mm) 1700
Connection between outrigger beam and platform Pin rotary, cylinder expanding
Average ground pressure (MPA) ≤0.1
Motor power (kw) 45
Hydraulic crowded system (MPA) 25/20
Hydraulic crowded system operation Manual & electric control
Total weight of piling rig (T) ≈130

Note: Specifications are subjected to change without prior notice.
Leader length can be extended to 42m according to special requirement.

JB160A Hydraulic Walking Piling Rig3

Application

MEXICAN PROJECT Product: D100&JB160A / TAIYUAN PROJECT Product: ZLD180 &JB160A /?PHILIPPINE PROJECT Product: D138&JB160A /?SHANGHAI EXPO SITE? Product: ZLD220 & JB160A / MALAYSIA PROJECT? Product: ZLD180+JB160A

JB160A Hydraulic Walking Piling Rig4
JB160A Hydraulic Walking Piling Rig7
JB160A Hydraulic Walking Piling Rig5
JB160A Hydraulic Walking Piling Rig8
JB160A Hydraulic Walking Piling Rig6

Service
1. FREE-CALL CENTER SERVICE
We provide free-call center service for 24hours. For further information of SEMW products or after-sale service, please call us at+0086-21-4008881749. We will provide information or solutions you need.

2. CONSULTANCY & SOLUTIONS
Our professional team offers free consulting services according to different job sites, soil conditions and your requirements.

3. TESTING & TRAINING
SEMW is committed to free guidance of installation and testing, to make sure that you can make proper operations.

We will offer training on site if it is necessary, to make sure you know the correct?way for maintenance, analysis and debugging of the malfunctions.

4. MAINTENANCE & REPAIR
We have offices in many places in China, easy for maintenance.
Sufficient supplies for spare parts and wearing parts.
Our service team has a wide range of professional experience on any size project?large or small. They provide best solutions with quick response.

5. CUSTOMERS & CONNECTIONS
After-sale customer file was set up for better understanding your need and feedback.
More services are provided, such as, sending info of new released products, latest?technology. We also provide special offer for you.

THE GLOBAL MARKETING NETWORK
Diesel Hammers are the key product of SEMW. They have achieved a good reputation domestically and overseas. SEMW diesel hammers are exported in a large quantity to Europe, Russia, Southeast Asia, North America, South America, and Africa.


Product detail pictures:

Super Lowest Price Pile Driving Analyzer Supplier -
 JB160A Hydraulic Walking Piling Rig – Engineering Machinery detail pictures

Super Lowest Price Pile Driving Analyzer Supplier -
 JB160A Hydraulic Walking Piling Rig – Engineering Machinery detail pictures

Super Lowest Price Pile Driving Analyzer Supplier -
 JB160A Hydraulic Walking Piling Rig – Engineering Machinery detail pictures


Related Product Guide:

We have been also concentrating on enhancing the things management and QC method so that we could preserve terrific edge inside the fiercely-competitive enterprise for Super Lowest Price Pile Driving Analyzer Supplier - JB160A Hydraulic Walking Piling Rig – Engineering Machinery, The product will supply to all over the world, such as: Sudan , Rwanda , Vancouver , Our company offers the full range from pre-sales to after-sales service, from product development to audit the use of maintenance, based on strong technical strength, superior product performance, reasonable prices and perfect service, we'll continue to develop, to deliver the high-quality items and services, and promote lasting cooperation with our customers, common development and create a better future.
  • The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Joyce from America - 2018.06.30 17:29
    Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.
    5 Stars By Anna from Greenland - 2017.04.08 14:55

    Related Products

    主站蜘蛛池模板: 亚洲AV无码国产精品草莓在线 | 狠狠躁日日躁夜夜躁A片小说按摩 | 草榴久久久久久久久久久 | 国产内射合集颜射 | 丰满熟妇乱又伦 | 亚洲精品一二三区久久伦理中文 | 免费av资源网站 新版天堂资源中文8在线 | 法国白嫩大屁股XXXX | 色橹橹欧美在线观看视频高清 | 国产电影无码午夜在线播放 | 亚洲精品久久久久久动漫器材一区 | 美丽的熟妇中文字幕 | 久久久久久av无码免费网站 | 亚洲中文字幕无码中字 | 荡货夹的这么紧欠C调教视频 | 好爽又高潮了毛片免费下载 | 麻豆AV一区二区三区久久 | 天天做天天添AV国产亚洲 | 国产精品无码不卡一区二区三区 | 91精品国产综合久久婷婷香蕉 | 爱爱一区二区三区 | 欧美牲交videossexeso欧美 | 7777久久亚洲中文字幕蜜桃 | 少妇扒开粉嫩小泬视频 | 国产人妻精品一区二区三区不卡 | 亚洲AV日韩精品久久久久久 | 亚洲国产精久久久久久久 | 久久人人爽天天玩人人妻精品 | 久久99青青精品免费观看 | 老司机久久中文无码 | 亚洲国产欧美国产综合一区 | 丁香五月综合久久激情 | 亚洲深深色噜噜狠狠网站 | 未满十八18禁止午夜免费网站 | 精品女同一区二区三区G下载 | 久久免费国产美女裸体精东 | JIZZJIZZ国产精品久久 | 国产无套内射久久久国产 | 黄7777导航 | 久久精品国产99国产精偷 | 国产精品白浆无码流出 |