国产精品免费久久久九九,久久草莓香蕉频线观,亚洲精品毛片一区二区,免费久久精品视频,国产人妖ts在线一区二区三区 ,国产区精品一区二区不卡中文,91精品一区二区三区在线观看 ,欧美人在线一区二区三区

8613564568558

To ensure steady progress in embankment filling, SEMW’s TRD construction machine once again assists in the construction of major water conservancy projects!

Helping the country rebuild major water conservancy projects after the disaster

To promote flood control wall construction at full speed

SEMW's pure electric drive TRD-C40E/70E construction machine

Strike hard again to help build the Jiyun Canal upgrade and renovation project

Make steady progress in embankment filling!

SEMW8

The Jiyun Canal is one of the main rivers in the northern three river systems of the Haihe River Basin, and undertakes the important task of discharging floods from the northern three river systems.

The Hangu section of the Jiyun Canal is located in the lower reaches of the river. In the "23.7" basin-wide flood of the Haihe River, some embankments and roads along the embankments were damaged. This section was managed according to the flood control standard of once in 10 years from 1992 to 2002. According to the requirements of the "Haihe River Basin Flood Control Plan" on the flood control standard of once in 20 years for the Jiyun Canal, this section of the embankment is now heightened and reinforced, and the embankment top road surface is hardened.

SEMW7

This project is of greatest significance for implementing the Jiyun Canal upgrading and renovation project, ensuring the comprehensive improvement of the flood control and drainage capabilities of this section of the Jiyun Canal, and ensuring the flood control and drainage safety along both sides of the Jiyun Canal, Ninghe New City, downstream Hangu New City and Sino-Singapore Eco-City, as well as other areas on both sides of the Jiyun Canal.

SEMW5

At present, the Jiyun Canal governance project has entered the sprint stage and is required to be put into use before the flood season this year. The construction period is very tight.

The total length of the embankment renovation project (Hangu section of the Jiyun Canal Binhai New District) is 26.767km. Since the construction site is close to the Jiyun Canal, the geological conditions are complex. The upper geological layer is mostly backfill soil, 3-4 meters below is shell land, and the deep is mainly clay and rubble. In addition, the site is extremely narrow and located in the tidal highland. Whenever the rainy season comes, the water level rises and the river water infiltrates into the main roads in the urban area, resulting in serious waterlogging. The complex working conditions make the construction quite difficult.

SEMW6

The construction party used a variety of mixing pile technology and rotary jet pile technology to test piles in the early stage, but the construction efficiency and wall quality were not good, and all ended in failure. After a long period of discussion, the construction party considered the construction efficiency and high wall quality as the starting point, and finally decided to use the TRD technology for construction. From the perspective of time nodes and construction geology, it is quite challenging, and it also puts higher requirements on construction equipment.

SEMW4

The expansion and layout of Shanggong Machinery's TRD products over the years has produced results.

The total construction volume of the TRD multi-section water-stop curtain continuous wall in this section is about 20,000 cubic meters, with a wall thickness of 600mm and a depth of 12m. Shanggong Machinery's TRD-C40E construction machine has the advantages of excellent efficiency, good performance, and simple operation. The equipment has a cutting speed limit of 3m/h and a daily construction length of 60 linear meters. At the same time, what makes the construction party more satisfied is that the equipment has the advantages of lower energy consumption and higher stability. With a working time of nearly 20 hours a day, it provides solid technical support for building a lifeline for the high-quality development of Jiyun Canal Water Conservancy!

SEMW3

The TRD-C40E construction machine has a dual power system, a pure electric main power system and a hydraulic auxiliary system (pure electric drive, higher efficiency, energy saving and environmental protection), and can adjust the motor speed and motor torque to meet different geological requirements. The maximum construction depth of the equipment is 50m, the wall width is 550-900mm, and the construction net height is 6.8m-10m. At the same time, the equipment has an intelligent construction management system, which makes operation and management easier, allowing owners to track the construction process and remotely monitor the construction quality.

SEMW2

After inspecting the construction efficiency and wall quality, the customer praised: "SEMW's TRD construction machine products performed excellently in the Jiyun Canal upgrading and reconstruction project. The wall construction speed is fast, energy consumption is saved, and the service is guaranteed. SEMW equipment is still selected for subsequent projects."

At the same time, 500 meters away from the TRD-C40E construction machine along this section, another TRD-70E construction machine of Shanggong Machinery performed equally well. Faced with the difficult situation of "two shifts without stopping" in the construction site, the TRD-70E construction machine, with its advantages of zero failures, high efficiency and high stability, overcame many difficulties such as tight construction period, heavy tasks and site restrictions, worked day and night to ensure the smooth progress of the Jiyun Canal upgrading and reconstruction project.

SEMW1

During the construction process, the safety, efficiency, stability, cutting ability, energy saving and environmental protection of TRD construction machine equipment are very important. At the same time, it also has excellent performance in terms of comfort. The equipment is equipped with an integrated cab, extra-large space, ultra-quiet, air-conditioned, and all control components are within reach, creating an optimal operating environment for the operators.

SEMW

Adhering to the mission and responsibility of being a national heavy equipment, SEMW provides a comprehensive range of high-efficiency and high-reliability underground foundation construction equipment, widely participates in various major engineering construction projects across the country, and contributes SEMW's strength to the construction of a beautiful China.


Post time: Mar-19-2025
主站蜘蛛池模板: 无码熟妇αⅴ人妻又粗又大 | 欧美成人精品第一区二区三区 | 精品亚洲一区二区三区在线播放 | 寂寞骚妇被后入式爆草抓爆 | 福利导航大全 | 我和子发生了性关系视频 | 亚洲av无码精品色午夜app | 少妇又紧又色又爽又刺激视频 | 韩国无码AV片在线观看网站 | 国产69成人精品视频免费 | 欧洲熟妇精品视频 | 亚洲欧洲∨国产一区二区三区 | 少妇扒开毛毛自慰喷水 | 人妻少妇精品中文字幕av | 亚洲精品第一国产综合精品 | 色偷偷9999WWW 国产女同事极品屁股 | 人人爽人人爱 | 熟女无套内射线观56 | 性做爰直播APP | 国产精品久久久久久中文字 | 中文无码精品一区二区三区 | 风流老太婆大bbwbbwhd视频 | 男阳茎进女阳道视频大全 | 国产偷抇久久精品A片图片 | 亚洲精品97久久中文字幕无码 | 国产强伦姧人妻毛片 | 成人免费XXXXX在线观看 亚洲AV无码精品色午夜 | 精品国产黑色丝袜高跟鞋 | 丰满的人妻HD高清日本 | 国产乱码精品一区二区三区中文 | 四川小少妇BBAABBAA | 偷朋友人妻系列H文 | 中文字幕亚洲乱码熟女一区二区 | 国产日韩AV免费无码一区二区三区 | 奇米色99欧美一区二区 | 成人无码免费一区二区三区 | 精品久久久久久天美传媒 | 国产乱人伦偷精品视频 | 成人熟女一区二区三区 | 日韩成人无码影院 | 性欧美videosex18嫩 |