Let’s attack together! SEMW’s green pile foundation equipment helps build a world-class manufacturing base in Wuxi!

National infrastructure construction, tide rises again

SEMW's new environmental protection method and equipment join hands to attack again

3 sets of static drilling and rooting machines stand upright and line up

down "rooted"

Manufacturing (Wuxi) project for Hua Hong

Ramming foundations, pillars and beams

As the 15th economic center city in China, Wuxi has a strong manufacturing industry and is the main manufacturing base in the Yangtze River Delta region. Recently, the second phase of Huahong Manufacturing (Wuxi) manufacturing base is under construction. The main force, SEMW, has 3 sets of SDP series static drilling and rooting machine equipment, working together, constantly challenging the construction limit, and escorting the project efficiently and stably.

semw
semw1

Huahong Manufacturing (Wuxi) project covers a total area of 114,000 square meters, with a total construction area of 530,000 square meters. There are 33 units in total, including: main production plant, power plant, 10 warehouses, 4 corridors, and 2 pipe corridors , 7 pipe bridges, underground pedestrian passages and other single buildings. After the completion of the project, it will build a world-class integrated circuit industrial cluster in Wuxi and provide a stronger "core" power.

semw2
semw3

The pile foundation of the manufacturing base project adopts the static drilling and rooting method, and the amount of rooting piles is 160,000 meters. Three sets of SDP series static drilling and rooting method drilling rigs of Shanggong Machinery make 20 piles (pile depth 21m) and 17 piles ( The pile depth is 52m) and the high-efficiency pile construction operation has been fully recognized by customers. The equipment can be matched with JB160M, JB170M, and JB180M double guide rail walking piling frames for construction.

semw4
semw5

As a green and environmentally friendly new-generation pile foundation construction equipment suitable for static drilling and rooting construction completely independently developed by SEMW, the main components of SEMW?SDP series static drilling and rooting machine adopt international famous brands, with large torque and large drilling depth , high technological content, good reliability, high construction efficiency and other characteristics, the performance has reached the international advanced level.

semw6
semw7

Introduction of Static Drilling and Rooting Method

The static drilling and rooting method is to use the static drilling and rooting pile method to drill holes, mix the whole process and expand the bottom, and finally implant the prefabricated pile body, that is, pretensioned prestressed concrete bamboo piles (PHDC), pretensioned prestressed bamboo piles Different specifications and models of stressed concrete pipe piles (PHC) and composite reinforced prestressed concrete pipe piles (PRHC) are combined in various combinations to meet design requirements, and construction is carried out according to drilling, reaming, grouting, implantation and other processes pile foundation method.

Construction method features:

●No soil extrusion, no vibration, low noise;

●The quality of the pile is good, and the elevation of the pile top is completely controllable;

●Extremely strong vertical compression, pullout and horizontal load resistance;

●Less mud discharge;

●It has good social benefits and promotion value.

Scope of application:

●Applicable to areas with various seismic fortification intensity, applicable pile diameter: 500-1200mm;

Cohesive soil, silt, sandy soil, filling soil, crushed (gravel) rocky soil, and rock formations with complex geological conditions, many interlayers, uneven weathering, and large changes in hardness and softness, the maximum depth of penetration: 90m;

When there are buildings (structures) or underground pipelines and other engineering facilities near the construction site, using other pile types will cause adverse effects;

When the elevation of the top of the bearing layer at the pile end changes greatly, the length of the pile is difficult to determine accurately, the construction site is not available, the conditions for pouring concrete on site or the quality of concrete pouring on site is not easy to guarantee;

●Projects with restrictions on the discharge of a large amount of mud;

●The design requires that the bearing capacity of a single pile is relatively large, and the technical and economic indicators and construction conditions are superior to other pile types.

semw8

Introduction of SDP Static Drilling and Rooting Machine

The SDP series static drilling and rooting method drilling rig is a new generation of drilling rig products independently developed by Shanggong Machinery, which is suitable for the construction of static drilling and rooting method, by taking advantage of the accumulated technical advantages of deep mixing drilling rigs for many years.

Construction method features:

?1、Adopt advanced oil pressure bottom expansion technology, the bottom expansion diameter is 1-1.6 times of the drilling diameter, the bottom expansion height is 3 times of the drilling diameter, and the advanced lower computer software historical data recording method is used to monitor the construction process The various data in the system are recorded and analyzed to form corresponding data curves.

semw9

2、Adopt intelligent construction management software, control adopts intelligent touch screen mode, monitor the construction process in real time to ensure construction quality, all construction data are clearly reflected on the display and automatically stored, and can be output and printed.

semw10

3. The operating system is equipped with a power-off 380V automatic shutdown program, which ensures that the data will not be lost due to crashes or power failures during the use of the drilling rig.

4. The motor starting method adopts soft start, and the soft starter itself has various motor protection functions, such as undervoltage, phase loss, phase sequence, overload and other protections.

5. The performance of the hydraulic bottom expansion technology is reliable, and the high-quality hydraulic components are used to ensure the normal operation of the hydraulic bottom expansion at a depth of 80m.

Advantages of static drilling and rooting piles

The static drilling and rooting pile adopts the low-noise drilling machine (static drilling) and the embedded method to complete the pile foundation technology of the prefabricated pile (planting pile), which is a master of modern pile foundation technology. After years of popularization and application, its significant advantages of "many, fast, good, and economical" such as green environmental protection, energy saving and emission reduction have been highly recognized by all walks of life.

Construction method features:

"many"

●Through the use of various pile types such as bamboo piles and composite reinforced piles, as well as bottom expansion and grouting techniques, the pile foundation's compression, pullout, and horizontal bearing capacity can be greatly improved;

●Applicable to various geological conditions, especially pile foundations with high bearing and dynamic load requirements.

"quick"

?●The construction efficiency is high, the single-machine single-day pile sinking can reach more than 300 meters, and the economic benefit is higher than other pile types;

●Through the current of the drilling rig, the change of the bearing layer can be detected without cutting piles;

●A simple, fast and reliable mechanical connection method can be selected to ensure the reliability of pile connection and the efficiency of construction.

?"good"

1. The pile materials are prefabricated in a factory, and the quality is guaranteed;

2. Embedded construction, no soil extrusion, no damage to the pile body;

3. Intelligent construction, automatic monitoring of equipment to ensure construction quality;

4. The pile body and pile joints are protected by cement and soil to improve the corrosion resistance;

5. Green and environmental protection, it fundamentally solves the problem of mud discharge in engineering construction.

?"Province"

Compared with bored piles under the same conditions:

1. Water saving (construction water saving 90%);

2. Energy saving (construction energy consumption can be saved by 40%);

3. Emission reduction (mud discharge is reduced by 70%);

4. Time saving (construction efficiency increased by 50%);

5. Cost saving (construction cost saving 10%-20%);

6. Reduce carbon emissions by more than 50%.

semw11
semw12

Facing the future, SEMWg will firmly aim at the double carbon goal, continue to promote green products, green manufacturing, green construction, etc., lead the green and sustainable development of the industry, and continue to create value for global customers.


Post time: Aug-04-2023
主站蜘蛛池模板: 最新中文字幕av专区 | 欧美一区二区三区啪啪 | 成人国内精品久久久久一区 | 欧美搡BBBBB摔BBBBB | 色色国产 | 亚洲日韩乱码中文无码蜜桃臀网站 | 国产男女爽爽爽免费视频 | 国产成人无码精品久久久性色 | 中文字幕乱码亚洲精品一区 | 精品天码乱码AV片国产爱色 | 牛牛在线视频 | 亚洲精品无码一区二区三区久久久 | 欧美女忧一区 | 亚洲爆乳少妇无码激情 | 日本丶国产丶欧美色综合 | 中文字幕无码日韩欧毛 | 成品人视频ww入口 | jαpαnesehd熟女熟妇伦 | 亚洲avav天堂av在线不卡 | 欧美一性一乱一交一视频 | 欧美 变态 另类 人妖 | 国产人产一区二区三区红桃影视 | 色九九| 欧美性A片人与善交A片 | 性色av一区二区三区 | 久久久久女人精品毛片九一 | 国产精品无码av天天爽 | 亚洲精品一区国产精品 | 不卡一卡二卡三乱码免费网站 | 麻豆国产尤物av尤物在线观看 | 国内精品国产成人国产三级 | 亚洲欧美精品午睡沙发 | 无码国产激情在线观看 | 老外和中国女人毛片免费视频 | 久久精品成人 | 亚洲精品人成无码中文毛片 | 国产成+人+综合+亚洲欧美丁香花 日产电影一区二区三区 | 青春草在线视频免费观看 | 国产精品无码久久久久 | 2018高清国产一区二区三区 | 色翁荡息又大又硬又粗又视频软件 |