国产精品免费久久久九九,久久草莓香蕉频线观,亚洲精品毛片一区二区,免费久久精品视频,国产人妖ts在线一区二区三区 ,国产区精品一区二区不卡中文,91精品一区二区三区在线观看 ,欧美人在线一区二区三区

8613564568558

Manufactur standard Auger Pile Machine - JB160A Hydraulic Walking Piling Rig – Engineering Machinery

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Sticking for the perception of "Creating goods of high quality and making good friends with people today from all around the world", we constantly set the interest of shoppers to begin with for Sdp Series Pre-Bored Pre-Cast Piling Equipment , Semw D8 Diesel Pile Hammer , Pile Hammers Manufacturer , Adhering to your small business principle of mutual positive aspects, we have now won superior popularity among our customers because of our best solutions, excellent products and competitive selling prices. We warmly welcome clients from your home and overseas to cooperate with us for common achievement.
Manufactur standard Auger Pile Machine - JB160A Hydraulic Walking Piling Rig – Engineering Machinery Detail:

Product Features
HYDRAULIC WALKING PILING RIG
1. MORE EFFECTIVE, STABLE AND DURABLE
The leader, main platform and walking gear are designed for heavy-duty pile driving,?to ensure more stable and effective work.
Weight carrier of bigger load bearing.

2. EASY FOR ASSEMBLY AND TRANSPORATION
Modular structure design, easy for assembly and disassembly.
Out triggers of the platform with the rotary pin structure, is driven by cylinder, which?saves trouble of disassembly. Can be disassembled and transported by parts, easy for
transportation.

3. ADVANCED ELECTRO-HYDRAULIC CONTROL SYSTEM AND TECHNOLOGY
Both main drum and auxiliary drum are under electro-hydraulic proportional control,?available for variable speed control and lock any speed.
Main pump, control valve, pressure gauge, drums are all using domestic and foreign?well-known brands.

4. PRACTICAL AND RELIABLE OPERATION MONITORING SYSTEM
Standard leader with goniometer and inductive load angle monitor (optional) provide instant information about batter piling and pulling force, set alarm while in danger. The previous functions can be achieved while the piling rig working with ZLD series agitating auger and sensors (optional).
Deep mixing pile monitor (optional) provides data of pile depth, piling speed, the amount of slurry, and output of the information.

5. COMFORTABLE OPERATION CAB FOR EASY CONTROL
Well insulated operator’s room with five wind shields assures bright, quiet environment with minimum fatigue.
Hydraulic actuated winch control levers allow well performance and easy control.
Space for drill control box, inductive load angle monitor (optional), deep mixing monitor (optional) is reserved in the operator’s room, make the single-driver control easy and reliable.

TECHNICAL PERFORMANCE CHARACTERISTICS OF JB160A
1. JB160A is equipped with capacious drums. Standard leader is 39m high?(Max.42m), suitable for SMW method.

2. Length of horizontal cylinder reaches up to 3100mm, easy to move while using?SMW method. Horizontal stroke of the cylinder reaches up to 400mm, providing?more flexibility in construction work.

3. JB160A lifting cylinders ensure a 900mm-lift-height.

4. Unique positioning structure design guarantees a self-erect without help of?service crane. JB160A can make 39m height.

5. JB160A was granted complete intellectual property rights and 7 authorized?patents, including 2 patents for invention.

Product Model: JB160A
Specifications

Item JB160A Hydraulic Walking?Piling Rig
Total length of leader (m) 21~39
Diameter of leader (mm) ?920
Center distance between leader and mounted equipment (mm) 600×?101.6
Leader inclination angle (left to right) (°) ±1.5
Backstay stroke (mm) 2800
Leader trimming cylinder stroke (mm) 400
Max. auger model ZLD180/85-3-M2-S
Max. diesel hammer model D160
Max. leader length (m) 39
Max. pulling force (with Max. leader) (KN) 706.3
Hydraulic winch (for mounting auger, diesel hammer) Pulling force of single rope (KN) 91.5max
Winding and rewinding peed (m/min) 0~26
Rope diameter (mm) ?21.5
Drum capacity (m) 550
Hydraulic winch (for uplift, drilling pipe, pile) Pulling force of single rope (KN) 68max
Winding and rewinding peed (m/min) 0~32
Rope diameter (mm) ?20
Drum capacity (m) 265
Swing angle (°) ±10
Transverse travel Travel speed (m/min) < 4.5
Travel step (mm) 3100
Vertical travel Travel speed (m/min) < 2.7
Travel step (mm) 800
Uplift of the track Speed (m/min) < 0.55
Height (mm) +450~-450
Distance between tracks Working (mm) 9100
Travelling (mm) 4800
Distance between pulleys in track Working (mm) 4800
Travelling (mm) 5000
Transverse-moving track Length (mm) 9500
Width (mm) 1200
Vertical-moving track Length (mm) 6900
Width (mm) 1700
Connection between outrigger beam and platform Pin rotary, cylinder expanding
Average ground pressure (MPA) ≤0.1
Motor power (kw) 45
Hydraulic crowded system (MPA) 25/20
Hydraulic crowded system operation Manual & electric control
Total weight of piling rig (T) ≈130

Note: Specifications are subjected to change without prior notice.
Leader length can be extended to 42m according to special requirement.

JB160A Hydraulic Walking Piling Rig3

Application

MEXICAN PROJECT Product: D100&JB160A / TAIYUAN PROJECT Product: ZLD180 &JB160A /?PHILIPPINE PROJECT Product: D138&JB160A /?SHANGHAI EXPO SITE? Product: ZLD220 & JB160A / MALAYSIA PROJECT? Product: ZLD180+JB160A

JB160A Hydraulic Walking Piling Rig4
JB160A Hydraulic Walking Piling Rig7
JB160A Hydraulic Walking Piling Rig5
JB160A Hydraulic Walking Piling Rig8
JB160A Hydraulic Walking Piling Rig6

Service
1. FREE-CALL CENTER SERVICE
We provide free-call center service for 24hours. For further information of SEMW products or after-sale service, please call us at+0086-21-4008881749. We will provide information or solutions you need.

2. CONSULTANCY & SOLUTIONS
Our professional team offers free consulting services according to different job sites, soil conditions and your requirements.

3. TESTING & TRAINING
SEMW is committed to free guidance of installation and testing, to make sure that you can make proper operations.

We will offer training on site if it is necessary, to make sure you know the correct?way for maintenance, analysis and debugging of the malfunctions.

4. MAINTENANCE & REPAIR
We have offices in many places in China, easy for maintenance.
Sufficient supplies for spare parts and wearing parts.
Our service team has a wide range of professional experience on any size project?large or small. They provide best solutions with quick response.

5. CUSTOMERS & CONNECTIONS
After-sale customer file was set up for better understanding your need and feedback.
More services are provided, such as, sending info of new released products, latest?technology. We also provide special offer for you.

THE GLOBAL MARKETING NETWORK
Diesel Hammers are the key product of SEMW. They have achieved a good reputation domestically and overseas. SEMW diesel hammers are exported in a large quantity to Europe, Russia, Southeast Asia, North America, South America, and Africa.


Product detail pictures:

Manufactur standard Auger Pile Machine -
 JB160A Hydraulic Walking Piling Rig – Engineering Machinery detail pictures

Manufactur standard Auger Pile Machine -
 JB160A Hydraulic Walking Piling Rig – Engineering Machinery detail pictures

Manufactur standard Auger Pile Machine -
 JB160A Hydraulic Walking Piling Rig – Engineering Machinery detail pictures


Related Product Guide:

We emphasize enhancement and introduce new solutions into the market just about every year for Manufactur standard Auger Pile Machine - JB160A Hydraulic Walking Piling Rig – Engineering Machinery, The product will supply to all over the world, such as: Kuwait , European , Nigeria , Customer satisfaction is our goal. We are looking forward to cooperating with you and providing our best services to suit your needs. We warmly welcome you to contact us and make sure you feel free to contact us. Browse our online showroom to see what we can do for you. And then E-mail us your specs or inquiries today.
  • After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
    5 Stars By Lauren from Netherlands - 2018.12.11 14:13
    The company has rich resources, advanced machinery, experienced workers and excellent services, hope you keep improving and perfecting your products and service, wish you better!
    5 Stars By Sahid Ruvalcaba from New Delhi - 2018.09.21 11:01

    Related Products

    主站蜘蛛池模板: 亚洲AV最新在线观看网址 | 亚洲欧洲中文日韩AV乱码 | 樱花草在线播放免费中文 | 999久久久国产999久久久 | 国产成人无码A区在线观看导航 | 人妻无码久久精品 | 国产精品99久久精品 | 热99RE久久精品这里都是精品免费 | 人妻VA精品VA欧美VA | 色狠狠久久AV北条麻妃 | 熟睡中被义子侵犯在线播放 | 国内揄拍高清国内精品对白 | а√中文在线资源库 | 99久久久无码国产精品9 | WWW一区二区WWW免费 | 欧美搡BBBBB搡BBBBB | 四虎永久地址WWW成人 | 99re热视频这里只精品 | 男人激烈吮乳吃奶动态图 | 中国人妻与老外黑人 | 多毛女共浴洗澡毛茸茸 | 国产精品亚洲一区二区三区在线 | 久久久久久久久久久综合日本 | 久久这里只有精品首页 | AV片在线观看 | 日日做A爰片久久毛片A片英语 | 97精品国产91久久久久久久 | 亚洲第一av导航av尤物 | 偷看少妇自慰XXXX | 樱花草在线观看播放www | 国产香蕉97碰碰久久人人 | 久久超乳爆乳中文字幕 | 人妻无码AV久久一二三区 | 少妇无码AV无码专区线 | 日本大香伊一区二区三区 | 国产精品第一国产精品 | CAOPORN视频在线观看 | 久久精品国产亚洲AV蜜臀色欲 | 国产成人无码A在线观看不卡 | CHINESE性内射高清国产 | 色综合视频一区二区三区 |