国产精品免费久久久九九,久久草莓香蕉频线观,亚洲精品毛片一区二区,免费久久精品视频,国产人妖ts在线一区二区三区 ,国产区精品一区二区不卡中文,91精品一区二区三区在线观看 ,欧美人在线一区二区三区

8613564568558

Good Quality Augercast Piles - Pre-bored Pre-cast Piling Equipment – Engineering Machinery

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We can easily normally satisfy our respected buyers with our excellent high-quality, excellent selling price and good service due to we've been far more expert and more hard-working and do it in cost-effective way for Vibration Pile Driving Equipment Manufacturer , Semw H240 Hydraulic Hammer , 25 Jet-Grouting Drilling Rig , We will make greater efforts to help domestic and international buyers, and create the mutual benefit and win-win partnership between us. we are eagerly waiting for your sincerely cooperation.
Good Quality Augercast Piles - Pre-bored Pre-cast Piling Equipment – Engineering Machinery Detail:

SDP Series Pre-bored Pre-cast Piling Equipment

FOB Price:? US $0.5 – 9,999,999 / Piece

Min. Order Quantity:? 1 Piece/Pieces

Supply Ability:? 100 Piece/Pieces per Month

Port:? Shanghai Port

Payment Terms:? L/C, D/A, D/P, T/T

Product Main Features:

1. No soil-squeezing, no vibration, noiseless

2. Great pile-forming quality, completely controllable of pile top elevation

3. Strong vertical compression, pull and horizontal load resistance

4. Low mud discharge

5. Good social benefit and promotion value

PRE-BORED PRE-CAST CONCRETE PILE METHOD

PRE-BORED PRE-CAST CONCRETE IMPLANTED PILE TYPE COMBINATION

Implanted pile: Precast pile with a certain combination of prestressed high strength concrete knot diversion pile (PHDC), prestressed reinforced high strength concrete pile (PRHC), prestressed high-intensity concrete pile (PHC), etc.

1. According to the geological conditions, select the appropriate pile type to increase

lateral and pile tip resistance.

2. Improve the resistance level and uplift bearing capacity of pile body

3. Prestressed high strength concrete knot pile (High-performance concrete implanted pile) (For short: PHDC)

Prestressed high-performance concrete pile with hot rolled ribbed steel bar.

The lateral resistance of the pile can be greatly increased through the interlocking between the pile and the surrounding area

The resistance characteristics of pile tip can be improved by underside extension.

4. Prestressed reinforced high strength concrete pile (For short: PRHC)

Prestressed reinforcement, non-prestressed reinforcement, End plate anchorage

The pile is using for upper segment pile of pile foundation, it can meet the high requirements of resistant compression, pulling and horizontal load.

Can partly replace steel pipe pile

EQUIPMENT TECHNOLOGY ADVANTAGES

With accumulated technology advantages of deep soil mixing drill, SEMW completely

independent research and develop SDP Series Pre-bored Pre-cast Piling Equipment, a

new generation of drilling equipment which is suitable for the static drilling method.

The main parts are international famous brands, which have the characteristics of high torque, great drilling depth, high scientific and technological content, good reliability, high construction efficiency, and the performance reaches the international advanced level.

1. SEMW SDP Series adopts the advanced oil pressure root-enlarging technology, the

root diameter is 1~1.6 times of the diameter of drilling hole and the root height is 3

times of the drilling hole’s diameter. In addition, advanced slave computer software

history data recording method is adopted to record various construction process

data of the same kind of imported products, such as borehole depth change, drilling

speed, construction process current, temperature condition water flow of borehole,

root-enlarging monitoring, amount of cement injected around pile tip etc. Setting

and storage of relevant construction data, such as construction unit, site number, pile

number, completion status, etc., can also be used to analyze various construction data

and form corresponding data curves.

2. Intelligent construction management software is adopted to control the use of intelligent touch screen mode to monitor the construction process in real time. Ensure the construction quality and all construction data are clearly reflected on the display and stored automatically, which can be printed out.

3. The SEMW SDP Series operating system is equipped with the power loss 380V automatic shutdown program. It ensures that the data will not be lost due to the crash or power failure during the operation of the drill.

4. The SEMW SDP Series motor start mode adopts soft start. The soft starter itself has various motor protection functions, such as under-voltage, missing phase, phase sequence, overload, etc. Besides, it has good cooling function and can be started frequently.

5. The technology of hydraulic root-enlarging has reliable performance and adopts excellent hydraulic components to ensure the normal operation of hydraulic root-enlarging under depth of 80m. Drilling tools are specially designed and manufactured with high strength, good bending and high wear resistance to reduce the maintenance costs.

Product Model: SDP 110H 150H 220

Specifications:

Item

Unit

SDP110H

SDP150H

SDP220

Max. drilling diameter

mm

Φ650(1040)/Φ750(1200)/Φ900(1440)

Rated speed of shaft

r/min

19.1/9.5

13.8 (8P)

Rated torque of shaft

KN.m

55/110

75/150

110/220

Basic length of shaft

m

3、4、6、9

Rated power of motor

KW

110(55×2)

150(75×2)

220(110×2)

Distance of Rod Center to Guide Center

mm

1000

920

Distance of Pulley Center to Guide Center

mm

655、800

Center distance between guides

mm

600XΦ102

Diameter of wire rope

mm

Φ22

Number of sheaves

pcs

6

Cement system pressure

Mpa

2.5

Hydraulic system pressure

Mpa

18

Joint for water and cement hose

Rc11?2

R1 2

Operating control

CAN-BUS、Electrical Control

Electrical Control

Power unit max. weight

t

About 8.4

About 8.5

About 12

Supporting piling rig

Same standard as SEMW

SPR115/ JB160A

Same standard as SEMW

SPR135/ JB180

Same standard as SEMW

SPR135/ JB180

Note: Specifications are subjected to change without prior notice.

?

?

?

?

?

?

Application:

  1. Applicable to various seismic fortification intensity areas, adapt to the pile diameter: 500-1200mm
  2. Clay, silt, sandy soil, filled soil, broken stones (gravel) soil and complicated geological situation, mezzanine much larger changes, uneven weathering, hard and soft rock strata, maximum depth: 90m
  3. When the building site is adjacent to a building (structure) or underground pipeline and other engineering facilities, other pile type will bring bad effects.
  4. Large changeable of pile end bearing layer top elevation, the length of the pile is difficult to accurately determine, the on-site pouring construction site does not have the coagulation soil conditions or pouring concrete is not easy to ensure quality.
  5. Discharge of large amounts of mud is limited.
  6. Single pile bearing capacity is required and technical and economic indexes and construction conditions are superior to other piles.

?

?

?

?

?

XIANGSHAN JINDU GARDEN

 

Commercial and residential buildings, both 17 floors, have one-layer basement, the excavation depth is about 5 meters. The total land area is 17833.7m2, the total building area is 5292m2. Pile type: PHC 5 0 0AB (10 0)+PH DC 5 5 0-4 0 0AB (9 5 ), pile length32-39m, characteristic value of load bearing capacity of single pile 1500KN; Pile type: PHC600AB(110)+PHDC650-500AB(100), pile length 32-39m, characteristic value of load bearing capacity of single pile 1800KN.

 

 

 

 

 

 

NINGBO MINGZHOU BIOMASS POWER PLANT

 

The project is located in maoshan, jiangshan town, yinzhou district, Ningbo.The maximum single column load is 1100KN (EXCEPT MAIN WORKSHOP) is 1100KN, the maximum single column load is 4000-5500KN. Pile type PHC600AB(110)+PHDC650-500(125)AB, pile length is 54m, the bearing layer of pile foundation is 5 layers round gravel with silty clay. Characteristic value of load bearing capacity of single pile is 1600KN.

WENZHOU POWER PLANT

 

The construction scale of the project is 2 x 600MW. The turbine building is 32m high, total load is 20000KN, chimney is 240m high, peak load is 220000KN. Bunker room’s load is 25000KN. The bearing layer of pile foundation is (7) gravel (egg) stone layer, pile length is 56-59m. Pile type is PRHC800(130) +PHC800AB (130) +PHDC800-600(130) AB, characteristic value of load bearing capacity of single pile is 5500KN. Pile type is PRHC

600(130) +PHC600AB (130) +PHDC650-500(125) AB, characteristic value of load bearing capacity of single pile is 4050KN.

Service:

  1. FREE-CALL CENTER SERVICE

We provide free-call center service for 24hours. For further information of SEMW products or after-sale service, please call us at+0086-21-4008881749. We will provide information or solutions you need.

  1. CONSULTANCY & SOLUTIONS

Our professional team offers free consulting services according to different job sites, soil conditions and your requirements.

  1. TESTING & TRAINING

SEMW is committed to free guidance of installation and testing, to make sure that you can make proper operations.

We will offer training on site if it is necessary, to make sure you know the correct

way for maintenance, analysis and debugging of the malfunctions.

  1. MAINTENANCE & REPAIR

We have offices in many places in China, easy for maintenance.

Sufficient supplies for spare parts and wearing parts.

Our service team has a wide range of professional experience on any size project

large or small. They provide best solutions with quick response.

  1. CUSTOMERS & CONNECTIONS

After-sale customer file was set up for better understanding your need and feedback.

More services are provided, such as, sending info of new released products, latest

technology. We also provide special offer for you.

?

THE GLOBAL MARKETING NETWORK

Diesel Hammers are the key product of SEMW. They have achieved a good reputation domestically and overseas. SEMW diesel hammers are exported in a large quantity to Europe, Russia, Southeast Asia, North America, South America, and Africa.


Product detail pictures:

Good Quality Augercast Piles -
 Pre-bored Pre-cast Piling Equipment – Engineering Machinery detail pictures

Good Quality Augercast Piles -
 Pre-bored Pre-cast Piling Equipment – Engineering Machinery detail pictures


Related Product Guide:

Our company sticks into the basic principle of "Quality is definitely the life of the business, and status may be the soul of it" for Good Quality Augercast Piles - Pre-bored Pre-cast Piling Equipment – Engineering Machinery, The product will supply to all over the world, such as: Congo , Sri Lanka , Uganda , Based on our automatic production line, steady material purchase channel and quick subcontract systems have been built in mainland China to meet customer's wider and higher requirement in recent years. We are looking forward to cooperating with more clients worldwide for common development and mutual benefit!Your trust and approval are the best reward for our efforts. Keeping honest, innovative and efficient, we sincerely expect that we can be business partners to create our brilliant future!
  • It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
    5 Stars By Cheryl from Guinea - 2018.09.19 18:37
    This is a reputable company, they have a high level of business management, good quality product and service, every cooperation is assured and delighted!
    5 Stars By Louis from Morocco - 2018.06.09 12:42

    Related Products

    主站蜘蛛池模板: 久久久噜噜噜久久熟女aa片 | 国产精品久久久久久妇女6080 | chinesemature老熟妇 | 国产精品内射后入合集 | 性按摩玩人妻HD中文字幕 | 久久亚洲av成人网站玖玖 | 国内精品国产成人 | 色视频综合无码一区二区三区 | 国产成A人片在线观看视频 | 67194熟妇在线永久免费观看 | 特黄AAAAAAA片免费视频 | 久久狠狠高潮亚洲精品 | 国产av无码专区亚洲av毛片搜 | 小兔子乖乖日本视频在线观看 | 91久久精品无码人妻一区二区三区 | 四虎国产精品成人免费久久 | 色欲日本久久久精品免费观看 | 国产精品三级在线观看无码 | 久久无码国产专区精品 | 国产成人午夜福利在线观看 | 亚洲成a人片在线观看无码专区 | 好爽又高潮了毛片免费下载 | 久久国产色AV免费看 | 国产女人的高潮国语对白 | 麻豆精产国品一二三产品何苗 | 无码人妻一区二区三区兔费 | 精品欧洲AV无码一区二区 | 最新JVID顶级SSS极品女 | 亚洲av无码精品无码麻豆 | 亚洲国产另类久久久精品黑人 | 久久久久久亚洲AV无码专区 | 精品久久久久久久久中文字幕 | japanese老熟妇乱子伦视频 | sese一区二区 | 午夜刺激黄瓜西瓜葡萄榴莲漫画 | 欧美艳星NIKKI激情办公室 | 中文字幕乱码中文乱码51精品 | 13小男生GAY自慰脱裤子 蜜臀精品无码av在线播放 | 狠狠躁日日躁夜夜躁2020 | 亚洲一区二区三区av无码 | 久久精品人妻一区二区蜜桃网站 |