国产精品免费久久久九九,久久草莓香蕉频线观,亚洲精品毛片一区二区,免费久久精品视频,国产人妖ts在线一区二区三区 ,国产区精品一区二区不卡中文,91精品一区二区三区在线观看 ,欧美人在线一区二区三区

8613564568558

Free sample for Flight Auger Piles - JB160A Hydraulic Walking Piling Rig – Engineering Machinery

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We rely upon strategic thinking, constant modernisation in all segments, technological advances and of course upon our employees that directly participate in our success for Spr Series Hydraulic Pile Driving Rig , Pile Hammers Manufacturer , Spr135 Hydraulic Pile Driving Rig , We're keeping chasing WIN-WIN situation with our consumers. We warmly welcome clientele from all around the environment coming above for a visit and establishing long lasting connection.
Free sample for Flight Auger Piles - JB160A Hydraulic Walking Piling Rig – Engineering Machinery Detail:

Product Features
HYDRAULIC WALKING PILING RIG
1. MORE EFFECTIVE, STABLE AND DURABLE
The leader, main platform and walking gear are designed for heavy-duty pile driving,?to ensure more stable and effective work.
Weight carrier of bigger load bearing.

2. EASY FOR ASSEMBLY AND TRANSPORATION
Modular structure design, easy for assembly and disassembly.
Out triggers of the platform with the rotary pin structure, is driven by cylinder, which?saves trouble of disassembly. Can be disassembled and transported by parts, easy for
transportation.

3. ADVANCED ELECTRO-HYDRAULIC CONTROL SYSTEM AND TECHNOLOGY
Both main drum and auxiliary drum are under electro-hydraulic proportional control,?available for variable speed control and lock any speed.
Main pump, control valve, pressure gauge, drums are all using domestic and foreign?well-known brands.

4. PRACTICAL AND RELIABLE OPERATION MONITORING SYSTEM
Standard leader with goniometer and inductive load angle monitor (optional) provide instant information about batter piling and pulling force, set alarm while in danger. The previous functions can be achieved while the piling rig working with ZLD series agitating auger and sensors (optional).
Deep mixing pile monitor (optional) provides data of pile depth, piling speed, the amount of slurry, and output of the information.

5. COMFORTABLE OPERATION CAB FOR EASY CONTROL
Well insulated operator’s room with five wind shields assures bright, quiet environment with minimum fatigue.
Hydraulic actuated winch control levers allow well performance and easy control.
Space for drill control box, inductive load angle monitor (optional), deep mixing monitor (optional) is reserved in the operator’s room, make the single-driver control easy and reliable.

TECHNICAL PERFORMANCE CHARACTERISTICS OF JB160A
1. JB160A is equipped with capacious drums. Standard leader is 39m high?(Max.42m), suitable for SMW method.

2. Length of horizontal cylinder reaches up to 3100mm, easy to move while using?SMW method. Horizontal stroke of the cylinder reaches up to 400mm, providing?more flexibility in construction work.

3. JB160A lifting cylinders ensure a 900mm-lift-height.

4. Unique positioning structure design guarantees a self-erect without help of?service crane. JB160A can make 39m height.

5. JB160A was granted complete intellectual property rights and 7 authorized?patents, including 2 patents for invention.

Product Model: JB160A
Specifications

Item JB160A Hydraulic Walking?Piling Rig
Total length of leader (m) 21~39
Diameter of leader (mm) ?920
Center distance between leader and mounted equipment (mm) 600×?101.6
Leader inclination angle (left to right) (°) ±1.5
Backstay stroke (mm) 2800
Leader trimming cylinder stroke (mm) 400
Max. auger model ZLD180/85-3-M2-S
Max. diesel hammer model D160
Max. leader length (m) 39
Max. pulling force (with Max. leader) (KN) 706.3
Hydraulic winch (for mounting auger, diesel hammer) Pulling force of single rope (KN) 91.5max
Winding and rewinding peed (m/min) 0~26
Rope diameter (mm) ?21.5
Drum capacity (m) 550
Hydraulic winch (for uplift, drilling pipe, pile) Pulling force of single rope (KN) 68max
Winding and rewinding peed (m/min) 0~32
Rope diameter (mm) ?20
Drum capacity (m) 265
Swing angle (°) ±10
Transverse travel Travel speed (m/min) < 4.5
Travel step (mm) 3100
Vertical travel Travel speed (m/min) < 2.7
Travel step (mm) 800
Uplift of the track Speed (m/min) < 0.55
Height (mm) +450~-450
Distance between tracks Working (mm) 9100
Travelling (mm) 4800
Distance between pulleys in track Working (mm) 4800
Travelling (mm) 5000
Transverse-moving track Length (mm) 9500
Width (mm) 1200
Vertical-moving track Length (mm) 6900
Width (mm) 1700
Connection between outrigger beam and platform Pin rotary, cylinder expanding
Average ground pressure (MPA) ≤0.1
Motor power (kw) 45
Hydraulic crowded system (MPA) 25/20
Hydraulic crowded system operation Manual & electric control
Total weight of piling rig (T) ≈130

Note: Specifications are subjected to change without prior notice.
Leader length can be extended to 42m according to special requirement.

JB160A Hydraulic Walking Piling Rig3

Application

MEXICAN PROJECT Product: D100&JB160A / TAIYUAN PROJECT Product: ZLD180 &JB160A /?PHILIPPINE PROJECT Product: D138&JB160A /?SHANGHAI EXPO SITE? Product: ZLD220 & JB160A / MALAYSIA PROJECT? Product: ZLD180+JB160A

JB160A Hydraulic Walking Piling Rig4
JB160A Hydraulic Walking Piling Rig7
JB160A Hydraulic Walking Piling Rig5
JB160A Hydraulic Walking Piling Rig8
JB160A Hydraulic Walking Piling Rig6

Service
1. FREE-CALL CENTER SERVICE
We provide free-call center service for 24hours. For further information of SEMW products or after-sale service, please call us at+0086-21-4008881749. We will provide information or solutions you need.

2. CONSULTANCY & SOLUTIONS
Our professional team offers free consulting services according to different job sites, soil conditions and your requirements.

3. TESTING & TRAINING
SEMW is committed to free guidance of installation and testing, to make sure that you can make proper operations.

We will offer training on site if it is necessary, to make sure you know the correct?way for maintenance, analysis and debugging of the malfunctions.

4. MAINTENANCE & REPAIR
We have offices in many places in China, easy for maintenance.
Sufficient supplies for spare parts and wearing parts.
Our service team has a wide range of professional experience on any size project?large or small. They provide best solutions with quick response.

5. CUSTOMERS & CONNECTIONS
After-sale customer file was set up for better understanding your need and feedback.
More services are provided, such as, sending info of new released products, latest?technology. We also provide special offer for you.

THE GLOBAL MARKETING NETWORK
Diesel Hammers are the key product of SEMW. They have achieved a good reputation domestically and overseas. SEMW diesel hammers are exported in a large quantity to Europe, Russia, Southeast Asia, North America, South America, and Africa.


Product detail pictures:

Free sample for Flight Auger Piles -
 JB160A Hydraulic Walking Piling Rig – Engineering Machinery detail pictures

Free sample for Flight Auger Piles -
 JB160A Hydraulic Walking Piling Rig – Engineering Machinery detail pictures

Free sample for Flight Auger Piles -
 JB160A Hydraulic Walking Piling Rig – Engineering Machinery detail pictures


Related Product Guide:

Persisting in "High quality, Prompt Delivery, Competitive Price", we have established long-term cooperation with clients from both overseas and domestically and get new and old clients' high comments for Free sample for Flight Auger Piles - JB160A Hydraulic Walking Piling Rig – Engineering Machinery, The product will supply to all over the world, such as: Afghanistan , French , Spain , We aim to build a famous brand which can influence a certain group of people and light up the whole world. We want our staff to realize self-reliance, then achieve financial freedom, lastly obtain time and spiritual freedom. We do not focus on how much fortune we can make, instead we aim to obtain high reputation and be recognized for our goods. As a result, our happiness comes from our clients satisfaction rather than how much money we earn. Ours team will do best for you personally always.
  • This is a honest and trustworthy company, technology and equipment are very advanced and the prodduct is very adequate, there is no worry in the suppliment.
    5 Stars By Eric from Bangladesh - 2017.01.11 17:15
    The company account manager has a wealth of industry knowledge and experience, he could provide appropriate program according our needs and speak English fluently.
    5 Stars By Lilith from Malaysia - 2018.09.29 17:23

    Related Products

    主站蜘蛛池模板: 成人性爱一区二区 | 久久91精品国产一区二区三区 | 奇奇色色东京热97色 | 大学生久久香蕉国产线看观看 | 女人张开腿无遮无挡图 | 人妻无码AV天堂二区网站 | 欧美成人版丛林激情A片 | 7777久久香蕉成人影院 | 国产熟女内射oooo | 久9视频这里只有精品 | 小蜜被两老头吸奶头在线观看 | 亚洲国产欧美日韩精品一区二区三区 | 久久青青草原亚洲av无码app | 久久精品麻豆日日躁夜夜躁 | 成人无码A级毛片免费 | 欧美男生射精高潮视频网站 | 人人妻人人妻人人片AV | 亚洲精品国产首次亮相 | 亚洲av无码av制服另类专区 | 美丽的熟妇中文字幕 | 成人免费无遮挡无码黄漫视频 | 亚洲色偷偷色噜噜狠狠99 | 亚洲欧美日韩一区在线观看 | 亚洲精品无码一区二区三区久久久 | 香蕉久久夜色精品国产 | 国产福利精品一区二区 | 影音先锋人妻啪啪av资源网站 | 久久99精品久久久久久水蜜桃 | 日韩一欧美内射在线观看 | 免费 人妻 无码 不卡中文... | 亚洲精品成a人在线观看☆ | 寂寞骚妇被后入式爆草抓爆 | 亚洲 都市 校园 激情 另类 | 国产亚洲精品资源在线26U | 午夜大胆裸体A级人体片 | 亚洲成a∨人片在线观看不卡 | 国产精品一品二区三区的使用体验 | 琪琪女色窝窝777777 | 99视频内射三四 | 97精品一区二区视频在线观看 | 中文字幕人成无码人妻综合社区 |