国产精品免费久久久九九,久久草莓香蕉频线观,亚洲精品毛片一区二区,免费久久精品视频,国产人妖ts在线一区二区三区 ,国产区精品一区二区不卡中文,91精品一区二区三区在线观看 ,欧美人在线一区二区三区

8613564568558

Factory Free sample Sectional Flight Auger - JB180 Hydraulic Walking Piling Rig – Engineering Machinery

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We are proud of the high customer satisfaction and wide acceptance due to our persistent pursuit of high quality both on product and service for Walking Pilling Rig Manufacturer , Pile Driving Hammer Manufacturer , Vibratory Pile Hammer , Since establishment within the early 1990s, now we have arrange our sale network in USA, Germany, Asia, and several Middle Eastern countries. We intention to get a top class supplier for worldwide OEM and aftermarket!
Factory Free sample Sectional Flight Auger - JB180 Hydraulic Walking Piling Rig – Engineering Machinery Detail:

Product Features
HYDRAULIC WALKING PILING RIG
1. MORE EFFECTIVE, STABLE AND DURABLE
The leader, main platform and walking gear are designed for heavy-duty pile driving,?to ensure more stable and effective work.
Weight carrier of bigger load bearing.

2. EASY FOR ASSEMBLY AND TRANSPORATION
Modular structure design, easy for assembly and disassembly.
Out triggers of the platform with the rotary pin structure, is driven by cylinder, which?saves trouble of disassembly. Can be disassembled and transported by parts, easy for
transportation.

3. ADVANCED ELECTRO-HYDRAULIC CONTROL SYSTEM AND TECHNOLOGY
Both main drum and auxiliary drum are under electro-hydraulic proportional control,?available for variable speed control and lock any speed.
Main pump, control valve, pressure gauge, drums are all using domestic and foreign?well-known brands.

4. PRACTICAL AND RELIABLE OPERATION MONITORING SYSTEM
Standard leader with goniometer and inductive load angle monitor (optional) provide instant information about batter piling and pulling force, set alarm while in danger. The previous functions can be achieved while the piling rig working with ZLD series agitating auger and sensors (optional).
Deep mixing pile monitor (optional) provides data of pile depth, piling speed, the amount of slurry, and output of the information.

5. COMFORTABLE OPERATION CAB FOR EASY CONTROL
Well insulated operator’s room with five wind shields assures bright, quiet environment with minimum fatigue.
Hydraulic actuated winch control levers allow well performance and easy control.
Space for drill control box, inductive load angle monitor (optional), deep mixing monitor (optional) is reserved in the operator’s room, make the single-driver control easy and reliable.

TECHNICAL PERFORMANCE CHARACTERISTICS OF JB180
1. JB180 leader can be extended up to 60m, together with ZLD series agitating auger, it can drill holes of depth up to 53m, which is the best choice for deep foundation reinforcement and soft soil conditions.
2. Weight carrier of bigger load bearing, suitable for long Auger and vibration impact hammer, conducting large – depth filling pile operations.
3. JB180 contains 8 lifting cylinders, increase site adaptability.
4. Unique positioning structure design guarantees a self-erect without help of service crane. JB180 can make 60m height.
5. JB180 was granted complete intellectual property rights and 6 patents, including 3 patents for invention and 3 patents for utility.
6. Customizable large operator room of JB180 can install air condition (optional),
more humanization configuration.

Product Model: JB180
Specifications

Item JB180 HydraulicWalking Piling Rig
Total length of leader (m) 21~60
Diameter of leader (mm) ?1220
Center distance between leader and mounted equipment (mm) 600×?102
Leader inclination angle (left to right) (°) ±1.5
Backstay stroke (mm) 3400
Leader trimming cylinder stroke (mm) 400
Max. auger model ZLD220/85-3-M2-CS
Max. diesel hammer model D180
Max. leader length (m) 60
Max. pulling force (with Max. leader) (KN) 800
Hydraulic winch (for mounting auger, diesel hammer) Pulling force of single rope (KN) 100max
Winding and rewinding peed (m/min) 0~21
Rope diameter (mm) ?22
Drum capacity (m) 835
Hydraulic winch (for uplift, drilling pipe, pile) Pulling force of single rope (KN) 110max
Winding and rewinding peed (m/min) 0~20
Rope diameter (mm) ?22
Drum capacity (m) 300
Swing angle (°) ±10
Transverse travel Travel speed (m/min) ≤3.4
Travel step (mm) 3100
Vertical travel Travel speed (m/min) ≤ 1.3
Travel step (mm) 800
Uplift of the track Speed (m/min) ≤ 0.44
Height (mm) 500
Distance between tracks Working (mm) 9400
Travelling (mm) 6000
Distance between pulleys in track Working (mm) 6000
Travelling (mm) 5000
Transverse-moving track Length (mm) 10800
Width (mm) 1800/1200
Vertical-moving track Length (mm) 6900
Width (mm) 1700
Connection between outrigger beam and platform Pin rotary, cylinder expanding
Average ground pressure (MPA) ≤0.1
Motor power (kw) 45
Hydraulic crowded system (MPA) 25/20
Hydraulic crowded system operation Manual & electric control
Total weight of piling rig (T) ≈195

Note: Specifications are subjected to change without prior notice.

Application

BEILUN NINGBO PORT PROJECT? ?Product: Diesel Pile Hammer & JB180 / THE GATE OF THE ORIENT, SUZHOU? ? Product: ZLD220 & JB180 / GUANGZHOU METRO PROJECT? ? ?Product: ZLD330&JB180

JB180 Hydraulic Walking Piling Rig3

Service
1. FREE-CALL CENTER SERVICE
We provide free-call center service for 24hours. For further information of SEMW products or after-sale service, please call us at+0086-21-4008881749. We will provide information or solutions you need.

2. CONSULTANCY & SOLUTIONS
Our professional team offers free consulting services according to different job sites, soil conditions and your requirements.

3. TESTING & TRAINING
SEMW is committed to free guidance of installation and testing, to make sure that you can make proper operations.
We will offer training on site if it is necessary, to make sure you know the correct?way for maintenance, analysis and debugging of the malfunctions.

4. MAINTENANCE & REPAIR
We have offices in many places in China, easy for maintenance.
Sufficient supplies for spare parts and wearing parts.
Our service team has a wide range of professional experience on any size project?large or small. They provide best solutions with quick response.

5. CUSTOMERS & CONNECTIONS
After-sale customer file was set up for better understanding your need and feedback.
More services are provided, such as, sending info of new released products, latest?technology. We also provide special offer for you.

THE GLOBAL MARKETING NETWORK
Diesel Hammers are the key product of SEMW. They have achieved a good reputation domestically and overseas. SEMW diesel hammers are exported in a large quantity to Europe, Russia, Southeast Asia, North America, South America, and Africa.


Product detail pictures:

Factory Free sample Sectional Flight Auger -
 JB180 Hydraulic Walking Piling Rig – Engineering Machinery detail pictures

Factory Free sample Sectional Flight Auger -
 JB180 Hydraulic Walking Piling Rig – Engineering Machinery detail pictures

Factory Free sample Sectional Flight Auger -
 JB180 Hydraulic Walking Piling Rig – Engineering Machinery detail pictures


Related Product Guide:

To constantly improve the management system by virtue of the rule of "sincerely, good faith and quality are the base of enterprise development", we widely absorb the essence of related products internationally, and constantly develop new products to meet the demands of customers for Factory Free sample Sectional Flight Auger - JB180 Hydraulic Walking Piling Rig – Engineering Machinery, The product will supply to all over the world, such as: Spain , Provence , Greek , Insisting over the high-quality generation line management and prospects guide provider, we have made our resolution to offer our shoppers using the initially stage purchasing and soon after provider working experience. Preserving the prevailing helpful relations with our prospects, we even now innovate our product lists the many time to meet up with the brand new wants and stick to the latest trend of this business in Ahmedabad. We're ready to facial area the difficulties and make the transform to grasp many of the possibilities in international trade.
  • A good manufacturers, we have cooperated twice, good quality and good service attitude.
    5 Stars By Austin Helman from Czech republic - 2017.03.28 16:34
    Product variety is complete, good quality and inexpensive, the delivery is fast and transport is security, very good, we are happy to cooperate with a reputable company!
    5 Stars By Ricardo from Peru - 2018.11.22 12:28

    Related Products

    主站蜘蛛池模板: 7777精品久久久久久 | 亚洲日韩欧洲乱码av夜夜摸 | 亚洲avav天堂av在线不卡 | WWW一区二区WWW免费 | 东北少妇不戴套对白第一次 | 三年中文在线观看免费大全 | 夜夜影院未满十八勿进 | 少妇被躁爽到高潮无码文 | 777亚洲精品乱码久久久久久 | 小兔子乖乖日本视频在线观看 | 精品久久8X国产免费观看 | 麻豆一区二区99久久久久 | 国产sm主人调教女m视频 | а天堂中文在线官网在线 | 国产人成午夜免电影费观看 | 色噜噜久久综合伊人一本 | 日本a级视频在线播放 | 人妻无码一区二区视频 | 日本少妇被爽到高潮无码 | 无码精品久久久久久人妻中字 | 国内精品国产成人国产三级 | 国产精品亚洲产品一区二区三区 | 亚洲乱码一区二区三区在线观看 | 夫妇交换聚会群4P疯狂大战 | 老师粉嫩小泬喷水视频90 | 成年免费视频黄网站zxgk | 国产色视频一区二区三区qq号 | 亚洲综合成人婷婷五月网址 | 麻豆XXXXXX在线观看 | 国产成人无码久久久精品一 | 已婚丰满少妇21p | 日韩精品一线二线三线优势 | 人妻丰满熟妇AV无码区免 | 天天干天天射天天操 | 国产精品IGAO视频网 | 日产电影一区二区三区 | 又硬又粗进去好爽免费 | 狂野欧美乱特黄A片 | 99久久精品一区二区成人 | 无码AV天天AV天天爽 | 亚州日本乱码一区二区三区 |