国产精品免费久久久九九,久久草莓香蕉频线观,亚洲精品毛片一区二区,免费久久精品视频,国产人妖ts在线一区二区三区 ,国产区精品一区二区不卡中文,91精品一区二区三区在线观看 ,欧美人在线一区二区三区

8613564568558

2019 Good Quality Semw Sdp110h Pre-Bored Pre-Cast Piling Equipment - Pre-bored Pre-cast Piling Equipment – Engineering Machinery

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our items are commonly identified and trusted by customers and may fulfill continuously switching economic and social wants of 180d Multifunction Hydraulic Drilling Rig Manufacturer , Semw Deep Cement Mixing System , Dra220 Dual Power Drilling Rig , Our company is working by the operation principle of "integrity-based, cooperation created, people oriented, win-win cooperation". We hope we can have a friendly relationship with businessman from all over the world.
2019 Good Quality Semw Sdp110h Pre-Bored Pre-Cast Piling Equipment - Pre-bored Pre-cast Piling Equipment – Engineering Machinery Detail:

SDP Series Pre-bored Pre-cast Piling Equipment

FOB Price:? US $0.5 – 9,999,999 / Piece

Min. Order Quantity:? 1 Piece/Pieces

Supply Ability:? 100 Piece/Pieces per Month

Port:? Shanghai Port

Payment Terms:? L/C, D/A, D/P, T/T

Product Main Features:

1. No soil-squeezing, no vibration, noiseless

2. Great pile-forming quality, completely controllable of pile top elevation

3. Strong vertical compression, pull and horizontal load resistance

4. Low mud discharge

5. Good social benefit and promotion value

PRE-BORED PRE-CAST CONCRETE PILE METHOD

PRE-BORED PRE-CAST CONCRETE IMPLANTED PILE TYPE COMBINATION

Implanted pile: Precast pile with a certain combination of prestressed high strength concrete knot diversion pile (PHDC), prestressed reinforced high strength concrete pile (PRHC), prestressed high-intensity concrete pile (PHC), etc.

1. According to the geological conditions, select the appropriate pile type to increase

lateral and pile tip resistance.

2. Improve the resistance level and uplift bearing capacity of pile body

3. Prestressed high strength concrete knot pile (High-performance concrete implanted pile) (For short: PHDC)

Prestressed high-performance concrete pile with hot rolled ribbed steel bar.

The lateral resistance of the pile can be greatly increased through the interlocking between the pile and the surrounding area

The resistance characteristics of pile tip can be improved by underside extension.

4. Prestressed reinforced high strength concrete pile (For short: PRHC)

Prestressed reinforcement, non-prestressed reinforcement, End plate anchorage

The pile is using for upper segment pile of pile foundation, it can meet the high requirements of resistant compression, pulling and horizontal load.

Can partly replace steel pipe pile

EQUIPMENT TECHNOLOGY ADVANTAGES

With accumulated technology advantages of deep soil mixing drill, SEMW completely

independent research and develop SDP Series Pre-bored Pre-cast Piling Equipment, a

new generation of drilling equipment which is suitable for the static drilling method.

The main parts are international famous brands, which have the characteristics of high torque, great drilling depth, high scientific and technological content, good reliability, high construction efficiency, and the performance reaches the international advanced level.

1. SEMW SDP Series adopts the advanced oil pressure root-enlarging technology, the

root diameter is 1~1.6 times of the diameter of drilling hole and the root height is 3

times of the drilling hole’s diameter. In addition, advanced slave computer software

history data recording method is adopted to record various construction process

data of the same kind of imported products, such as borehole depth change, drilling

speed, construction process current, temperature condition water flow of borehole,

root-enlarging monitoring, amount of cement injected around pile tip etc. Setting

and storage of relevant construction data, such as construction unit, site number, pile

number, completion status, etc., can also be used to analyze various construction data

and form corresponding data curves.

2. Intelligent construction management software is adopted to control the use of intelligent touch screen mode to monitor the construction process in real time. Ensure the construction quality and all construction data are clearly reflected on the display and stored automatically, which can be printed out.

3. The SEMW SDP Series operating system is equipped with the power loss 380V automatic shutdown program. It ensures that the data will not be lost due to the crash or power failure during the operation of the drill.

4. The SEMW SDP Series motor start mode adopts soft start. The soft starter itself has various motor protection functions, such as under-voltage, missing phase, phase sequence, overload, etc. Besides, it has good cooling function and can be started frequently.

5. The technology of hydraulic root-enlarging has reliable performance and adopts excellent hydraulic components to ensure the normal operation of hydraulic root-enlarging under depth of 80m. Drilling tools are specially designed and manufactured with high strength, good bending and high wear resistance to reduce the maintenance costs.

Product Model: SDP 110H 150H 220

Specifications:

Item

Unit

SDP110H

SDP150H

SDP220

Max. drilling diameter

mm

Φ650(1040)/Φ750(1200)/Φ900(1440)

Rated speed of shaft

r/min

19.1/9.5

13.8 (8P)

Rated torque of shaft

KN.m

55/110

75/150

110/220

Basic length of shaft

m

3、4、6、9

Rated power of motor

KW

110(55×2)

150(75×2)

220(110×2)

Distance of Rod Center to Guide Center

mm

1000

920

Distance of Pulley Center to Guide Center

mm

655、800

Center distance between guides

mm

600XΦ102

Diameter of wire rope

mm

Φ22

Number of sheaves

pcs

6

Cement system pressure

Mpa

2.5

Hydraulic system pressure

Mpa

18

Joint for water and cement hose

Rc11?2

R1 2

Operating control

CAN-BUS、Electrical Control

Electrical Control

Power unit max. weight

t

About 8.4

About 8.5

About 12

Supporting piling rig

Same standard as SEMW

SPR115/ JB160A

Same standard as SEMW

SPR135/ JB180

Same standard as SEMW

SPR135/ JB180

Note: Specifications are subjected to change without prior notice.

?

?

?

?

?

?

Application:

  1. Applicable to various seismic fortification intensity areas, adapt to the pile diameter: 500-1200mm
  2. Clay, silt, sandy soil, filled soil, broken stones (gravel) soil and complicated geological situation, mezzanine much larger changes, uneven weathering, hard and soft rock strata, maximum depth: 90m
  3. When the building site is adjacent to a building (structure) or underground pipeline and other engineering facilities, other pile type will bring bad effects.
  4. Large changeable of pile end bearing layer top elevation, the length of the pile is difficult to accurately determine, the on-site pouring construction site does not have the coagulation soil conditions or pouring concrete is not easy to ensure quality.
  5. Discharge of large amounts of mud is limited.
  6. Single pile bearing capacity is required and technical and economic indexes and construction conditions are superior to other piles.

?

?

?

?

?

XIANGSHAN JINDU GARDEN

 

Commercial and residential buildings, both 17 floors, have one-layer basement, the excavation depth is about 5 meters. The total land area is 17833.7m2, the total building area is 5292m2. Pile type: PHC 5 0 0AB (10 0)+PH DC 5 5 0-4 0 0AB (9 5 ), pile length32-39m, characteristic value of load bearing capacity of single pile 1500KN; Pile type: PHC600AB(110)+PHDC650-500AB(100), pile length 32-39m, characteristic value of load bearing capacity of single pile 1800KN.

 

 

 

 

 

 

NINGBO MINGZHOU BIOMASS POWER PLANT

 

The project is located in maoshan, jiangshan town, yinzhou district, Ningbo.The maximum single column load is 1100KN (EXCEPT MAIN WORKSHOP) is 1100KN, the maximum single column load is 4000-5500KN. Pile type PHC600AB(110)+PHDC650-500(125)AB, pile length is 54m, the bearing layer of pile foundation is 5 layers round gravel with silty clay. Characteristic value of load bearing capacity of single pile is 1600KN.

WENZHOU POWER PLANT

 

The construction scale of the project is 2 x 600MW. The turbine building is 32m high, total load is 20000KN, chimney is 240m high, peak load is 220000KN. Bunker room’s load is 25000KN. The bearing layer of pile foundation is (7) gravel (egg) stone layer, pile length is 56-59m. Pile type is PRHC800(130) +PHC800AB (130) +PHDC800-600(130) AB, characteristic value of load bearing capacity of single pile is 5500KN. Pile type is PRHC

600(130) +PHC600AB (130) +PHDC650-500(125) AB, characteristic value of load bearing capacity of single pile is 4050KN.

Service:

  1. FREE-CALL CENTER SERVICE

We provide free-call center service for 24hours. For further information of SEMW products or after-sale service, please call us at+0086-21-4008881749. We will provide information or solutions you need.

  1. CONSULTANCY & SOLUTIONS

Our professional team offers free consulting services according to different job sites, soil conditions and your requirements.

  1. TESTING & TRAINING

SEMW is committed to free guidance of installation and testing, to make sure that you can make proper operations.

We will offer training on site if it is necessary, to make sure you know the correct

way for maintenance, analysis and debugging of the malfunctions.

  1. MAINTENANCE & REPAIR

We have offices in many places in China, easy for maintenance.

Sufficient supplies for spare parts and wearing parts.

Our service team has a wide range of professional experience on any size project

large or small. They provide best solutions with quick response.

  1. CUSTOMERS & CONNECTIONS

After-sale customer file was set up for better understanding your need and feedback.

More services are provided, such as, sending info of new released products, latest

technology. We also provide special offer for you.

?

THE GLOBAL MARKETING NETWORK

Diesel Hammers are the key product of SEMW. They have achieved a good reputation domestically and overseas. SEMW diesel hammers are exported in a large quantity to Europe, Russia, Southeast Asia, North America, South America, and Africa.


Product detail pictures:

2019 Good Quality Semw Sdp110h Pre-Bored Pre-Cast Piling Equipment -
 Pre-bored Pre-cast Piling Equipment – Engineering Machinery detail pictures

2019 Good Quality Semw Sdp110h Pre-Bored Pre-Cast Piling Equipment -
 Pre-bored Pre-cast Piling Equipment – Engineering Machinery detail pictures


Related Product Guide:

We pursue the administration tenet of "Quality is superior, Services is supreme, Standing is first", and will sincerely create and share success with all customers for 2019 Good Quality Semw Sdp110h Pre-Bored Pre-Cast Piling Equipment - Pre-bored Pre-cast Piling Equipment – Engineering Machinery, The product will supply to all over the world, such as: Saudi Arabia , Sierra Leone , Moscow , We hope we can establish long-term cooperation with all of the customers. And hope we can improve competitiveness and achieve the win-win situation together with the customers. We sincerely welcome the customers from all over the world to contact us for anything you need!
  • The factory workers have a good team spirit, so we received high quality products fast, in addition, the price is also appropriate, this is a very good and reliable Chinese manufacturers.
    5 Stars By Aaron from Hungary - 2017.05.21 12:31
    Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
    5 Stars By Kay from Colombia - 2018.12.14 15:26

    Related Products

    主站蜘蛛池模板: 久久精品国产视频在热 | 日本Aⅴ大伊香蕉精品视频 | 无码精品A∨在线观看十八禁 | 亚洲精品成人区在线观看 | 亚洲AV无码乱码精品国产 | 强奸乱伦 制服诱惑 | 91无码精品久久久一区 | 中文字幕人成无码人妻综合社区 | 国产AV一区二区三区天堂综合网 | 国产第一页屁屁影院 | 大鸡吧久久久 | 国产伦精品一区二区三区免.费 | 国产成人久久精品激情 | 亚洲精品天堂无码中文字幕 | 无码人妻精品一区二区 | 好吊色欧美一区二区三区视频 | 久久久久夜夜夜精品国产 | 又湿又紧又大又爽a视频 | 国产高跟黑色丝袜在线 | 日本丰满熟妇无码惨叫 | 日本乱子人伦在线视频 | 99久久综合精品五月天 | 国产精品人人做人人爽人人添 | 精品久久久久久无码人妻 | 亚州日本乱码一区二区三区 | 日本真人裸交试看120秒 | 无码中文字幕色专区 | 久久久久亚洲精品无码系列 | 一日本道A高清免费播放 | 沈芯语MD0050视频在线观看 | 日本十八禁视频无遮挡 | 国产精品久久国产精品99 | 精品少妇一区二区三区免费观 | 亚va芒果乱码一二三四区别 | 日韩一本之道一区中文字幕 | 亚洲AV日韩精品久久久久久久 | 无码一区二区久久999 | 国产精品天天看天天狠 | 国产免费破外女真实出血视频 | 日本午夜精品理论片a级app发布 | 青青操久久五月 |